Home |
Search |
Today's Posts |
![]() |
|
Electronics Repair (sci.electronics.repair) Discussion of repairing electronic equipment. Topics include requests for assistance, where to obtain servicing information and parts, techniques for diagnosis and repair, and annecdotes about success, failures and problems. |
|
LinkBack | Thread Tools | Display Modes |
#1
![]()
Posted to sci.electronics.repair
|
|||
|
|||
![]()
Hi!
I have a 700VA UPS that has dead batteries... I'm about to purchase replacement batteries but got to thinking.. The batteries this UPS takes are 6v 12aH and there are 2 of them running in series = ~12v together (13+ realistically) I can replace the 2 batteries running in series, but was thinking about extending the runtime of the UPS by running 4 batteries.. (2 sets of 2 running in parallel) Or should I just get 2 larger 6v batteries with more aH rating instead? Of course they might have to be outside the UPS instead. Or I could get 1x12v sealed lead acid battery instead. I realize that a larger battery might not charge well or properly on this UPS. How might this affect the UPS circuitry and invertor? I'm only trying to extend the run time and not the capacity of the UPS. IBM Office Pro 700 (I've actually got the older serial port model) http://www.tripplite.com/products/pr...productID=2801 Anyone have any feedback/thoughts on this? TIA |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Power supply | Metalworking | |||
Newbie question re power supply sources | Electronics Repair | |||
Power supply questions | Metalworking | |||
Converting old PC power supply to hobbyist PSU | Electronics | |||
Need help re power supply for new Digital (DLP) tv | Home Ownership |