"TimR" wrote in message
news:RlGYe.262632$E95.254294@fed1read01...
I need to temporarily run a length of romex 6/2 with ground ( rated for
inside use) across my flat roof.. I expect it'll be up there maybe two or
three weeks. Is it o.k. as is...or should I run it in electrical pvc
conduit to keep the sun off it while it is in temporary use ? (live in
Phoenix...still about 98-103 during the days)
Thanks, Tim
NM cable is not rated to be inside a conduit system. I ran my pool pump with
12-2 NM for a month while I got the new conduit run. As long as the 6 is
enough for the load and distance.
|