So would you guys just cut the entire section out (7x7 feet), or cut on
both sides of that crack (maybe 7x3) and regroove there?
I don't mind the demo work and repouring, but if I don't have to do a
TON of concrete, that's all the better.
What about the overlay stuff?
|