Thread: Building Regs
View Single Post
  #1   Report Post  
blakey9000
 
Posts: n/a
Default Building Regs

I'm currently having a loft conversion done. My architect drew up the
plans and they have been submitted and approved by building regs. The
build is now nearly finished, but one of the guys from the loft
company said that the building inspector my insist that I have a wall
built downstairs, for fire regs. Bearing in mind that the building has
been altered according to the submitted and approved plans can the
Building regs people then change their minds? If so it strikes me as a
bit bonkers having commiteed 25K to this build so far and I really
dont want any of it changing.

Cheers

Blakey