View Single Post
  #4   Report Post  
John Rumm
 
Posts: n/a
Default

wrote:

Depends a lot on where you are, but around £60-£80 per cubic metre
(assuming a full load, 6m^3).



What if its not a full load ?


The price per m^3 goes up ;-)

(Some of those mixer on a lorry services can be quite good for smaller
amounts. They just knock up what you need on site)

--
Cheers,

John.

/================================================== ===============\
| Internode Ltd -
http://www.internode.co.uk |
|-----------------------------------------------------------------|
| John Rumm - john(at)internode(dot)co(dot)uk |
\================================================= ================/