View Single Post
  #2   Report Post  
Joseph Meehan
 
Posts: n/a
Default

uriah wrote:
Due to general errosion throughout neighborhood one section of my
drive way needsa build up layer due to water and mud after rains. the
section is 15' by 12'. 0"at both ends and 3"in the center. Can I
just acid wash the section and fill in with concrete or must the whole
sectrion be a mimimum thickness.
Stan


Rather than add concrete to the top, contract your local mud jackers and
get an estimate. They drill holes about 3" in diameter and pump concrete
under the pad and lift it.


--
Joseph Meehan

Dia duit