"The Natural Philosopher" wrote in message
Expect to spend 5-7k plus any extra piping, installed.
Bloody hell, that's a lot.
How much to dig a pit, concrete the base, bricking the sides with two
skins and rendering the inside with a 5:1 sand and cement?
A concrete top, two inspection covers and a load of rubble for a
soakaway or let it empty into reeds in a pond and the job's a good'un.
You need to fill the thing with clean water before you put the top on,
in case it needs another coat of render. Personally, I'd give it a
scratch and two coats. I can't remember how large they need to be but a
10 x 5 x 5 may be about right.
That was in the days before concrete rings were in common use.
--
Posted via Mailgate.ORG Server -