Thread
:
Plasterboarding Stud Wall
View Single Post
#
10
John Rumm
Posts: n/a
wrote:
One more thing:
The problem I have now is that one part of the new stud wall is running
parallel with the ceiling joists. When I come to plasterboard the
ceiling I'm worried that there will be nowhere to screw the
plasterboard edge too, the nearest joist that I can screw to is about
350mm away. Will this provide enought rigidity? (if thats a word)
Just nail/screw a bit of 2x2" to the side of the top rail and then screw
the PB to that.
--
Cheers,
John.
/================================================== ===============\
| Internode Ltd -
http://www.internode.co.uk
|
|-----------------------------------------------------------------|
| John Rumm - john(at)internode(dot)co(dot)uk |
\================================================= ================/
Reply With Quote