View Single Post
  #11   Report Post  
:::Jerry::::
 
Posts: n/a
Default


"Doctor Evil" wrote in message
...

snip

He is wrong. Divide and rule. Try two combi's. one doing one shower,

one
doing the other. Combine the outlets for the baths to fill them

quickly,
using non-return valves and a shock arrestor on the bath side on the
non-return valves.

Have one combi do upstairs heating and one do downstairs. Simple and

cheap
and effective. Have each combi have its own gas supply right back

to the
gas meter.

Check the mains water pressure and flow. Replace the mains stop

cock with a
full-bore stop cock irrespective, and have dedicated 22mm cold

supplies to
the combi's from the stop cock. Take the cold supply for each

shower off
the combi supply just before the combi. Any pressure fluctuations

on that
line will be equal on both cold and hot at the shower.

Combi's are cheap.


But the work to install all of the above isn't.....