View Single Post
  #6   Report Post  
Lurch
 
Posts: n/a
Default Query: Copper pipe at boiler connection point requirement? (P.S.)

On Thu, 15 Apr 2004 20:55:17 GMT, in uk.d-i-y Ian Stirling
strung together this:

Seri wrote:
P.S.
Does anyone know if I need a 'Flue Gas Analyser' to install one of
these?


Does the manual specify one?


I think when the manual say 'have a suitable person commission the
boiler' it assumes he will bring his own tools. It doesn't specify a
screwdriver or adjustable spanner is needed, but they probably will.
--

SJW
A.C.S. Ltd.