View Single Post
  #4   Report Post  
Mikepier
 
Posts: n/a
Default

What I have done in the past is let the pvc waste pipe stick up at
least 5 inches above finished floor. Once the tile work was done, I
would cut the vc pipe flush with the floor then install the flange
assembly. Never had a problem doing it like this.