View Single Post
  #13   Report Post  
John Rumm
 
Posts: n/a
Default Building a shed from scratch

Steven Briggs wrote:

I've just been down the timber yard, sawn 25x75 is a bit scaggy. 2nd
choice was CLS, but they only have 2.4m in stock. So 50x75 regularised
carcassing it is. It'll work out the same cost as CLS when wastage is
taken in to account.


Don't know if your preference for assembly is screwing or nailing, but I
found that two 4" twinthread quickscreews (Screwfix) per joint made for
very strong framing even when screwed into the end grain of the wood.

I thought Jabfloor was polystrene, i.e. not to be in contact with PVC
wiring?


It is - hence why I put all the wires in oval conduit.

--
Cheers,

John.

/================================================== ===============\
| Internode Ltd - http://www.internode.co.uk |
|-----------------------------------------------------------------|
| John Rumm - john(at)internode(dot)co(dot)uk |
\================================================= ================/