View Single Post
  #6   Report Post  
Sexytom976
 
Posts: n/a
Default

Just go outside have the wife spray you down with the hose.
You can do the same for her! Do that for a few days and the
shower will be completed in to time.


Norman K wrote:
The tile wall in my bathtub needs replacement as there are cracks in

the
grout and drywall that's beneath it. I don't think I have time to do

a
complete repair on a single weekend so I was hoping I could install

concrete
backerboard, tape and mortar the joints and corner and finish the job

of
installing tile for a latter weekend. Do you think okay to use the
bath/shower in this condition for 3-4 weeks until the tile can be

installed?