View Single Post
  #2   Report Post  
PJx
 
Posts: n/a
Default

On Thu, 24 Feb 2005 08:58:15 GMT, "Norman K" wrote:

The tile wall in my bathtub needs replacement as there are cracks in the
grout and drywall that's beneath it. I don't think I have time to do a
complete repair on a single weekend so I was hoping I could install concrete
backerboard, tape and mortar the joints and corner and finish the job of
installing tile for a latter weekend. Do you think okay to use the
bath/shower in this condition for 3-4 weeks until the tile can be installed?

No.