"Eric R Snow" wrote in message
...
This is sorta on topic because its for walls in a machine shop. My
shop is a steel building. Inside are steel stud walls that hold the


[snip]

would be substantially higher with the drywall. I can't do it myself
for at least 6 weeks but I can hire someone to get it done next week.
Thank You,
Eric R Snow


The big negative I see it that based on my trips to the lumber store lately
that is no one manufacturing 3/8" or 1/2" plywood that isn't all warped and
crappy looking unless you go with the furniture grades. You might take a
look at Hardipanel which is a 4' by 8' cement product. Used it to side my
new garage and it worked out pretty well. Just be prepared to sacrifice a
circular saw and a dust mask.

http://www.jameshardie.com/homeowner...hardipanel.php

You also might want to check with your insurance company and pose a
"hypothetical" question to see if their answer makes your decision.