View Single Post
  #4   Report Post  
JimmySchmittsLovesChocolateMilk
 
Posts: n/a
Default


"Edwin Pawlowski" wrote in message
om...

"Jaxx" wrote in message
...
Hi,

I have a bi-level home (open front door and either go upstairs or
downstairs). The downstairs is not finished. There are poured contrete
walls only half way up (as the basement is only "half below ground").
The poured concrete creates a ledge around the entire basement. My
question is how do I deal with this concrete ledge when I am framing and
insulating?

Any help would be great.

Jaxx


Frame the bottom and insulate it, cover with sheetrock. Now you put a
board on top to make a shelf. You will probably need a 1 x 12 (that is
what I have) round the front edge a bit, trim with some molding. I can
email you a picture of mine if you'd like. The shelf is nice for holding a
bookcase, planters, etc.
--
Ed
http://pages.cthome.net/edhome/


Go with the ledge idea, I did the same in my old place, its a nice look,
and makes a great bar ledge when playing ping-pong in the basement.
the other option of going straight up will make your room seem slightly
smaller, and, you will have realllllyy deep window, though, this would
allow you to put in a tone of insulation to keep those exterior walls warm.