View Single Post
  #15   Report Post  
Silvan
 
Posts: n/a
Default

mac davis wrote:

She's been through a lot and making the transition from hospital to
home (and kids) is sort of a shock to the system all by itself..

Just try to be a buffer between her and the kids for a few days, and
she'll be back to normal in no time..


Which STILL won't get me laid.

A DC for the house. I like that idea. Hafta super glue the little dust
collectors (oh, I mean figurines) to the box so they don't get sucked up,
but then you could have 4" ports at strategic locations. Maybe with
synchronized air jets to blast the dust off just prior to collection. If I
cover all this stuff with lace doilies, she'll let me build it. Know where
I can get lace doilies big enough to cover DC plumbing?

--
Michael McIntyre ---- Silvan
Linux fanatic, and certified Geek; registered Linux user #243621
http://www.geocities.com/Paris/Rue/5407/
http://rosegarden.sourceforge.net/tutorial/