View Single Post
  #102   Report Post  
Dave Plowman (News)
 
Posts: n/a
Default

In article ,
John Rumm wrote:
So given the task of sticking a 22mm run of pipe across a series of
(un-notchable) joists at 400mm spacing, how are *you* going to install
it without using lots of short sections of pipe?


ISTR Adam recommending drilling the holes in line, then removing part of
the outside wall for access so a length of copper tube could be slid in.
Said it was common practice with heating professionals.

--
*When a clock is hungry it goes back four seconds.*

Dave Plowman London SW
To e-mail, change noise into sound.