Thread: bricklaying
View Single Post
  #20   Report Post  
Paper2002AD
 
Posts: n/a
Default

Can anyone give me a rough guide as to how many bricks a bricklayer should
be able to lay in an hour/day/week


Take a look at the latest free magazine at Travis Perkins - details of a
bricklaying system where a different bonding agent is used. The 'muck' is
dispensed in two perfectly measured lines along the whole course (for double
skin wall) with the ends of the bricks to be laid buttered by the same machine
with the bricks on the ground, in rows and on end. The result (they say) is a
perfect bond and bricks laid in less time.

How many bricks now then guys?