View Single Post
  #16   Report Post  
Matt Whiting
 
Posts: n/a
Default

Greg O wrote:

"JTMcC" wrote in message
news
The connection to the meter is probably painted, but the line from the hot
tap to the riser is most likely poly coated steel pipe. All underground


gas

piping is either coated or taped these days. Even if you have a plastic
service from the main, the riser will probably be coated steel
Where in the world are gas companies putting a steel jacket on plastic
pipe??




All over the US!
Running steel pipe underground is getting to be a thing of the past.
The poly, not plastic, polyethylene actually, pipe is direct buried in the


Poly = plastic.


Matt