View Single Post
  #11   Report Post  
SteveC1280
 
Posts: n/a
Default

If you can, stack the wood in the house with air spaces between boards for a
week or so to acclimate to the moisture conditions in the house. I had some
freshly kiln dried flooring buckle after I installed it acclimated to the
house.

Remove the 'remove' in my address to e:mail me.