View Single Post
  #7   Report Post  
Douglas Johnson
 
Posts: n/a
Default

(Mya70) wrote:

Hi guys,

This may be an odd question, but how long does it take to tile a shower? Just
a regular stand-up shower, 3.5 feet wide, 8 feet high? I ask because I've
hired someone to do it and it's taking forever. It makes me wonder whether I
had any idea just how big a job this was or whether this guy just works
incredibly slow.


We just a shower (walls, curb, and floor, including the installation of a mud
base) and bath floor (about 5'x9') installed. It took one guy two long days (8
am to 7 pm).
-- Doug