Default OT. Ford Lightning. Battery F150



"Ed Pawlowski" wrote in message
...
On 5/22/2021 12:56 AM, Joey wrote:

Yep, stop ****ing natural gas against the wall heating
houses and use nukes to do that with electricity.


It wont ever be gone, at worst we synthesise it using power from nukes.


Nope, nukes for ships work fine.


Yep, buy building more nukes.


And the best way to do that is with nukes, not stupid EVs.


You have a lot of plans for nukes. Better get them started to be ready in
time.


There is no rush.

This is the time needed for construction, the permitting process can be
very long too.


It wasnt for those with a clue like France until
they were actually stupid enough to let the
EU tell them how nukes must be done.

How long does it take to build a new power plant? 40-60 months


Not in china. You lot should look at how they do them. And thats
nothing like the time needed to produce viable EV designs anyway.

If we're talking actual construction time of a nuclear power plant, it's a
bit of a long endeavor and depends on the design.


So use the best designs. Not rocket science.

Generally, plant construction can take 40-60 months from the first
concrete pour to the end of construction when fuel is loaded.


And thats nothing like the time needed to produce viable EV designs anyway.