You have a lot of plans for nukes. Better get them started to be ready
in time. This is the time needed for construction, the permitting
process can be very long too.

How long does it take to build a new power plant?
40-60 months
If we're talking actual construction time of a nuclear power plant, it's
a bit of a long endeavor and depends on the design. Generally, plant
construction can take 40-60 months from the first concrete pour to the
end of construction when fuel is loaded.