View Single Post
  #5   Report Post  
Posted to uk.d-i-y
ARW ARW is offline
external usenet poster
 
Posts: 10,161
Default Rubbish metal back boxes

On 31/10/2020 18:11, John Rumm wrote:
On 31/10/2020 14:08, ARW wrote:
Doing a rewire with steel conduit for the drops.

Now what sort of a company puts the 25mm knockouts at different levels
on the 1g and 2g sockets so that whey you link them with a bush and
coupler they are 5mm out of level?



What brand / supplier did they come from?

(so we can avoid!)



Deta.

--
Adam