View Single Post
  #14   Report Post  
Posted to uk.d-i-y
Tim Watts[_5_] Tim Watts[_5_] is offline
external usenet poster
 
Posts: 355
Default Earthing through plastic pipe

On 14/02/2020 11:06, Tim Watts wrote:
On 13/02/2020 22:35, TimW wrote:


Earth rod and required RCD measures if you are a TT installation.


But are you maybe a TN-C-S or TN-S (supplier provided earth) and this
clamp was merely equipotential bonding?



Going to add - if you can't work it out, best call a local sparky around
asap to check it out. The worst case scenario as others have mentioned
is a very dangerous installation.