On 04/12/2019 16:16, Brian Gaff (Sofa 2) wrote:
Would it not go through the window and the cost would probably bankrupt the
scaffolding company. Yes it seems that the scaffolding is often erected by a
contractor of the contractor.
Brian



I had scaffolding at the front of my house during the summer and around
6 weeks later my neighbour had the same. Two different companies and it
was evident from how the scaffolding was erected and dismantled[1] that
the company that I employed knew what they were doing and the company
that my neighbour used were somewhat lacking in skill.

Price guide for anyone interested (SE Essex): £360 incl. VAT. I had the
scaffolding up for around 5 weeks with no extra charges.

[1]
Mid-terrace houses and 3 stage scaffolding to front of house up to roof
ridge above bay windows. My house, when dismantling it was less than one
hour from the truck tuning up, 3 men to dismantle and load the truck to
the truck leaving. My neighbours scaffolding company nearer 4 hours to
do the same job with 3 men.



--