On 03/12/2019 21:37, ARW wrote:
2nd year apprentice had the task.
I had already drilled the holes and fitted the red rawl plugs. About a
2m length of dado.
He has access to a screw box and an impact driver (with a proper PZ2 bit
fitted).
So how long?
3 h
--
Cheers,
John.
/================================================== ===============\
| Internode Ltd -
http://www.internode.co.uk |
|-----------------------------------------------------------------|
| John Rumm - john(at)internode(dot)co(dot)uk |
\================================================= ================/