Concrete drying time
Would not a dpm just under the slab tend to wear out rather fast letting all
those problems reoccur?
Brian
--
----- --
This newsgroup posting comes to you directly from...
The Sofa of Brian Gaff...
Blind user, so no pictures please
Note this Signature is meaningless.!
"Robin" wrote in message
...
On 29/09/2019 13:17, Andrew wrote:
On 29/09/2019 10:23, Tricky Dicky wrote:
Logic would suggest that if you have a DPM below the concrete then the
only way out for the moisture is through the top surface. I believe
curing time for concrete is 28 days.
I have not consulted this site in a while but checking it out may
definitively answer your question;
http://pavingexpert.com/
Richard
I always thought proper drying time was a month per inch of concrete,
i.e. longer than you expect.
You can put a secondary dpc on top of the slab.
where then would the moisture go? (I thought that was why DPM above the
slab was an /alternative/ to DPM below it.)
--
Robin