View Single Post
  #1   Report Post  
Posted to uk.d-i-y
Tim Lamb[_2_] Tim Lamb[_2_] is offline
external usenet poster
 
Posts: 6,938
Default Concrete drying time

Unbelievable an *on topic* thread:-)

Is there a time limit between laying oversite concrete and fitting the
insulation, dpc and screed?

Concrete drying time must be similar to screed and there are lots of
warnings about that. Does it matter if the insulation foil is in contact
with moist concrete?
--
Tim Lamb