View Single Post
  #33   Report Post  
Posted to uk.d-i-y
djc djc is offline
external usenet poster
 
Posts: 505
Default Can Building Control over-ride planning permission?

On 10/08/2019 10:10, Bert Coules wrote:
Harry Bloomfield wrote:

Would four steps mean going the steps to grab the door handle, pulling
the door open and having to reverse down the steps whilst pulling?


Yes, or standing one step down, reaching up to open the door, then
making slightly less of a reverse descent.

Seems wrong to me.


Me too, hence (presumably) the building reg requirement of a sort of
outside landing deep enough to allow the door to be opened while the
opener remains on the same level.



The problem with steps immediately in front of the door is the danger
that, without being able to see the step until the door is open,
someone exiting in a hurry will not see the step and fall.




Tricky to arrange in my case, though
- to the extent that I'm beginning to wonder about replacing the (uPVC)
door with an inward-opening one.




--
djc

(–€Ì¿Ä¹Ì¯–€Ì¿ Ì¿)
No low-hanging fruit, just a lot of small berries up a tall tree.