Donald MacLennan wrote:
No "decent spark" would leave an installation without testing it to the
required standard anyway. The legislation for this already exists. Guidance
note 3 to BS 7671. The work you describe would require a full electrical
inspestion certificate which would only be valid if a "schedule of test
results" along with a "schedule of inspections" were to be appended to it.
I already have and use test equipment. I would have to purchase
certified/calibrated equipment were I requird to fill in certificates.
--
Ed Sirett - Property maintainer and registered gas fitter.
The FAQ for uk.diy is at
www.diyfaq.org.uk
Gas fitting FAQ
http://www.makewrite.demon.co.uk/GasFitting.html
Sealed CH FAQ
http://www.makewrite.demon.co.uk/SealedCH.html