View Single Post
  #31   Report Post  
Ed Sirett
 
Posts: n/a
Default Forthcoming Building Regulations on electrical work (Part P)

Donald MacLennan wrote:




No "decent spark" would leave an installation without testing it to the
required standard anyway. The legislation for this already exists. Guidance
note 3 to BS 7671. The work you describe would require a full electrical
inspestion certificate which would only be valid if a "schedule of test
results" along with a "schedule of inspections" were to be appended to it.


I already have and use test equipment. I would have to purchase
certified/calibrated equipment were I requird to fill in certificates.

--
Ed Sirett - Property maintainer and registered gas fitter.
The FAQ for uk.diy is at www.diyfaq.org.uk
Gas fitting FAQ http://www.makewrite.demon.co.uk/GasFitting.html
Sealed CH FAQ http://www.makewrite.demon.co.uk/SealedCH.html