View Single Post
  #4   Report Post  
Posted to uk.d-i-y
Terry Casey Terry Casey is offline
external usenet poster
 
Posts: 1,005
Default Weird local builders

In article ,
says...

...
the top of the concrete looked like it was level with the
floor of the house. But, surely they'd have spotted that before pouring
concrete. I know they are planning some sort of resin-bonded finish on
top of the concrete.


So, rain splashing up the wall would penetrate the brick work
and, assuming the DPC is at floor level, the final level will
be above and bridging the DPC?

We had drainage added here when we moved in because the drive
is only one brick below the DPC.



--

Terry

---
This email has been checked for viruses by AVG.
https://www.avg.com