In trader_4 writes:
Continuous is defined in the code as an expected load over 3 hours.
If the code didn't address water heaters separately and essentially
treat his 20 gal WH as a continuous load, I would argue that it isn't
a continuous load at all.
au contrare. If the water heater is starting
with a full tank of cold water, hmm, let's see...
20 gallons (yeah, I'll stick with US units)
weighs about 160 pounds.
If we take a value of, oh, fifty degrees F for
the incoming cold water, and want to raise
it to 125F, that's a 75 degree change
160 pounds [enter], 75 [times] = 12,000 BTUs.
conversion of watts - BTU is about 3.5
12,000 [enter], 3.5 [divide] = 3,400 watt-hours
He's got a 2,000 watt heater element, so that's
about one and 3/4 hours.
So yeah, if I were designing specs (or insalling
the wiring, etc.) for a water heater, then
I'd do the derating to 80 percent.
(Of course, that's a non issue since Code does,
in fact, have a specific entry for water heaters.
Thanks for that pointer. It had washed out of
my memory).
--