2- Pour a self-leveling mortar bed.Â* This seems to make the most sense
to me, however, I've never worked with it before.Â* Also, on the left
side, it's going to be paper thin where it meets the existing pad which
is already even with the old sub-floor.Â* Won't that area be prone to
cracking and breaking up?Â* Would I need some sort of mesh fabric to
reinforce it?
Actually, I forgot that I'm putting in a cabinet on the left side of the
doors, here.
The difference in height is 3/8, where the cabinet would end, so I could
pour the mortar to that point, 3/8" deep, using a curb of some sort. So
it wouldn't have to taper all the way down to paper thin.
--