replying to Mya70, Terry wrote:
That is approximately a 7 -8 hour job assuming there is no prep work on walls
and if u are using Kerdi board or type of waterproofing like that could be an
extra cpl hrs and that is if using a good tile saw using a small motor tile
saw takes much longer to cut tile.After 24 hrs the grout can be applied non
sanded grout could be done that size grouting that size shower in a cpl
hrs.Using sanded gtout takes a bit more time. So total without water proofing
material 2days or approx. 9-10 hrs

--