On Thursday, December 1, 2016 at 9:10:52 PM UTC-5, TimR wrote:
On Thursday, December 1, 2016 at 5:30:30 PM UTC-5, TomR wrote:
After you open up the wall behind the shower, buy shutoff valves (I would
suggest ball valves with a waste port such as:
http://www.dongyavalve.com/products/...0valve122.html ). That way, you
can install them first and then continue the job later if needed without
having to turn off water in the whole house.
Good idea but I don't think there's room. There's a sink and vanity on the back side of the shower and I have to work above it. I may be able to screw a plug into the supply depending on whether it's threaded or soldered.
Can you cut the pipes and put a SharkBite cap on them while you do most of the tear-out and
install?
BTDT