View Single Post
  #11   Report Post  
Jim M
 
Posts: n/a
Default Followup On Problems with Oneway 2436

Considering that the motor had to be shipped to Stratford Ontario from who
knows where. Average ground shipping is 5 - 6 days one way - basically a
week. So two weeks are taken right up with the shipping. If it had to go
across the border, there is another delay. Then there is time to be worked
on and boxed back up and shipped out. Three weeks is not un-realistic with
shipping to, worked on and shipped back.