View Single Post
  #2   Report Post  
Posted to rec.woodworking
woodchucker[_3_] woodchucker[_3_] is offline
external usenet poster
 
Posts: 2,223
Default eWoodShop - Bath Remodel 2014

On 1/23/2014 5:10 PM, Swingman wrote:
Bath remodel to assist client with medically necessary, handicapped
access to shower and facilities:

https://picasaweb.google.com/1113554...t=directlin k


Time was of the essence ... 19 days from start to finish.


Nice job.

2 things, did you paint blue before putting tiles up in the bathroom or
is that something else?

The shower doors look wrong. Since the shower head is to the left, the
outter sliding door should be on the outside to prevent water from going
between the 2 panes, it looks like the opening is the inside door.



--
Jeff