On 5/11/2012 1:39 PM, Wild_Bill wrote:
Maybe what would benefit your assembly operation the most is a
new/better method of press-forming the short tubular sections
(grommet-like connector?).
You're right, the tube has up to 5 brushes and 2 plates separated by
elastomer spacers. the stack of parts is almost twice as long as the
tube. The tube already has a flaring operation on one end and is then
forced through the stack and pushes a spring-loaded mandrel that the
parts are stacked on out of the way When the mandrel bottoms out the
tube end hits a flare and "grommets" that end.
Any ideas on how to improve it?
Here's the finished product:
http://www.wisesales.com/shindaiwa-c...g#.T67vpetv9ng