Steve B wrote:
Thanks for your help. I can get mustered this winter, and get it
done this spring.
See these for more info:
http://howto.millardlumber.com/blocks/concreteblock.htm
http://faculty.delhi.edu/hultendc/A2...cture-Web.html
http://www.wbdg.org/design/env_wall_masonry.php
I'm not sure what is usually done regarding filling in the cells. I
wouldn't think that it's common to fill in all the cells of all the
blocks. Some of these diagrams show rebar placed from top to bottom and
filled in with concrete - that's probably what I'd do.
I think a lot depends on if your wall is subject to lateral loading
(like a free-standing wall) with no right-angle bends in it, or if this
is soil retaining wall.