Default Solar install (almost) complete

You should have had the approval to connect before proceeding!

I have seen 100s of KW of PV panels that are not allowed to be grid
connected. The Power Authority doesn't want any more in that location due to
grid or load capacities. People spent big bucks to have them installed based
on the salespeople cons and they sit there useless.

Best of luck and hope it all works out for you on that one! 6.5kW could be
used in your home but you would not be set up for a battery system and
batteries cost more than grid power on an on-going basis.

--------------
"Doug Winterburn" wrote in message
eb.com...

Solar City finished the install today (minus two roof tiles). It's a
6.5KW 28 panel system.

Now waiting for APS (local power utility) to install a bi-directional
meter and give the go ahead to power up.

More to come after a few months usage...

- Doug

--
"A man can fail many times, but he isn't a failure until he begins to
blame somebody else." -John Burroughs