Thread: Spindle crash
View Single Post
  #18   Report Post  
Posted to rec.crafts.metalworking
Ignoramus25139 Ignoramus25139 is offline
external usenet poster
 
Posts: 15
Default Spindle crash

On 2010-08-21, Karl Townsend wrote:
On Fri, 20 Aug 2010 22:12:12 -0700, Gunner Asch
wrote:

On Fri, 20 Aug 2010 23:55:01 -0500, Ignoramus11290
wrote:

Gunner, I was watching this:

http://www.youtube.com/watch?v=etLSxAV15lQ

and wondering, how much are you asking for your omniturn.

i


actually..I have one of each..GT75 and retrofitted Hardinge.

Both are well used and rough, and need me to go through them completely.

Ill sell one for $6-9k, the other for $9-11k.

Shall I take your order?


Iggy, its time for you to watch for a lathe to refit. I just tore down
a Hardinge HNC for spare parts because I was sure it wouldn't bring
$1K. You should have little trouble doing better than that. Hardinge
iron can't be beat.


Karl, maybe next year, I still have a lot to do. So tell me, those
Hardinge HNCs, which I also saw selling for $1k, can be refitted with
a new control easily? (easily, to me, means, not harder than my
Bridgeport). Docs available? Do they have an indexable turret?