On 6/14/2010 12:23 PM, Bill wrote:
*** All bets down ***
Since I don't have to have the power turned off at the meter to make my
modifications, a permit is not required.
They handed me my check back.
*** Take the pass, pay the don'ts ***
Comment: I had to go to the county level ("Builing and Zoning Department")
as, although I have a city mailing address, technically my area is not
incorporated as a part of the city. YMMV
Magic word ... "unincorporated".
--
www.e-woodshop.net
Last update: 4/15/2010
KarlC@ (the obvious)