RKON
 
Posts: n/a
Default Finishing Basement Shop Questions

Bill:

I have been framing my basement over the past couple of months and have
concrete poured walls. I have left a 1/4 inch gap between the concrete and
framing for moisture. If I read you posting correctly your walls are already
insulated and you want to frame up against them. I would add a 6mil layer
of plastic to the foil face and then frame up the walls leaving a 1/4" gap
for airflow.

Good luck !!

wrote in message
...
This may be a bit off topic, but it does relate to my new basement WW
shop.

First, some background. I have an unfinished basement in my new
house. I have a 16.5' x 33' x 9' area set aside for my shop. Three of
the walls are poured concrete foundation walls. The fourth wall is
stud framed for about 80% and the remainder concrete foundation. The
concrete foundation walls are covered horizontally with (2) 4' wide,
foil faced, continuous wrap fiberglass insulation bats held to the
wall using PAD* anchors.

The stud wall I intend to cover with a smooth faced 1/2" plywood. This
allows me to mount cabinets or shelves or clamp racks where ever I
please.
I don't really want to fully frame out the remaining walls. I'd like
to maintain as much floor space as I can. My intention is to fur out
the walls with 2x4's on the flat and then covering with my choice of
plywood, paneling, or drywall.
What I'm not sure about is how to handle the existing insulation.
Should I:
1. Leave it, and place the furring strip 2x4's over it?
or
2. Cut it wherever there will be a furring stri, then re-staple or
tape it to the furring strip?
or
3. Rip it down toss it out, and re-insulate using 1.5" foam board
between my furring strips.

The remaining walls and ceiling need to be finished (to minimize dust
migration, provide smooth all mounting surfaces etc, and I'm undecided
on how to go about this. Any suggestions?