Subpanel box wiring
On Aug 3, 10:41*pm, "John Grabowski" wrote:
wrote in message
... *I noticed that you didn't splice the #10 hot wire so that you can
feed the other half of the panel.
Correct-- the other half of the panel is dead.
Do you have the metal ceiling box grounded with a green
10/32 screw?
No, I was planning to do that when I installed the fixture, but
it is easy enough to add.
*All of
your grounds should be spliced correctly for rough inspection.
All of the grounds are spliced using the crimp connectors.
I am surprised that the crimp-style connectors would be
considered incorrect. I always thought them superior to
wire nuts. I would have used standard wire nuts except on
the advice of an experienced electrician.
Thanks for the tips!
John
|