"DerbyDad03" wrote in message
As far as quoting plywood for a steel roof, I could see it happening.
On my quote, the wording about the 1/2" ply is a standard typed
clause, like the site cleanup, 30 lb felt, etc. There's lots of
specific stuff handwritten, but the ply quote is standard and noted
with "as needed".

I wonder if it was the same case with your building - a standard "as
needed' clause which obviously wouldn't be needed.

On the other hand, if the guy wrote (or typed) it in specifically for
your job - then that's another story!

*****************************

I'm pretty sure it was just a standard clause, but he did not address the
real issue, replacing some of the steel deck. If they don't pay attention
to details in the bid, will they pay attention to the details in the roof?
I knew that some deck would have to be replaced.

The company that did the job also did two other roof sections a couple of
years ago. Weismann Roofing is a top notch outfit with fair prices and
professional work. They have the equipment and experienced people to do the
big jobs. Since this section (33,000 sq ft) was done we had them do the
office roof (10,000 ft shingled)
--
Ed