Drywall ceiling - basement
On Mon, 21 Jan 2008 17:18:10 GMT, "Mikey S." wrote:
Since your doing it the right way, with inspections, just call and ask your
inspector before you do the job, It will take 5 minutes and it's the only
safe and foolproof way to avoid a BIG problem later on when the inspector
shows up.
What's in the code is important, but not nearly as important as what the
inspector thinks is in the code :-)
I don't believe the inspector would argue about 5/8 inch rock on the
ceiling.
Oren
--
|