View Single Post
  #21   Report Post  
Posted to rec.crafts.metalworking
Brent Brent is offline
external usenet poster
 
Posts: 197
Default Update on the Containerized shop

On Sep 11, 9:02 am, "Pete C." wrote:
Too_Many_Tools wrote:

On Sep 10, 5:42 pm, "Pete C." wrote:
"Wayne C. Gramlich" wrote:


Brent wrote:
[snip]


The container is delivered and resting on eight pads made up of a pair
of 4 inch solid concrete blocks. For the most part not all are
touching but if there is any settling the open ones will start taking
the load


When it is time to ship the container, how hard is it
for a shipper to pick it up off the concrete pads? Is
this a "standard procedure" or "time to rent a special
crane" or "something else"?


[snip]


Thanks,


-Wayne


Easy to pick up. For non port pickup and delivery of containers
hydraulic tilting flatbed trailers with big winches are the norm. They
could very easily drag the container onto the trailer as is, or for a
little more refinement jack the container off the blocks and onto some
pipe rollers first.- Hide quoted text -


- Show quoted text -


Good point....maybe now is a good time to attach the machines to a
false floor so if and when you move later they are already secured.


TMT


False floor??? The container floor is already 25mm hardwood plywood over
steel C channel on about 12" centers. Bolt directly through that floor,
can use big washers or load plates underneath as well.


I'll be bolting everything big down and everyting medium sized or on
wheels will be strapped i there is shifting that occurs i'll make sure
i have some squishable space with no critical stuff like a row of milk
crates