View Single Post
  #5   Report Post  
Posted to rec.crafts.metalworking
Wayne C. Gramlich Wayne C. Gramlich is offline
external usenet poster
 
Posts: 13
Default Update on the Containerized shop

Brent wrote:
[snip]

The container is delivered and resting on eight pads made up of a pair
of 4 inch solid concrete blocks. For the most part not all are
touching but if there is any settling the open ones will start taking
the load


When it is time to ship the container, how hard is it
for a shipper to pick it up off the concrete pads? Is
this a "standard procedure" or "time to rent a special
crane" or "something else"?

[snip]

Thanks,

-Wayne